Pagadian Solar

Pagadian Solar

Share

We are a Solar Panel Installer and Services, located at Tiguma Pagadian City Zambonga del Sur.

For site visits please contact us, network and WhatsApp:
Rely Asuncion +63 9193368447
Allan (bobong) Jumuad +63 9947930140

12/04/2026

Calling all BDO Unibank clients, here's your chance. Grab it now...

https://www.facebook.com/100066547688034/posts/1293929699501941/?app=fbl



CTTO

TikTok · user9155409366570 01/04/2026

TikTok · user9155409366570 7551 likes, 1364 comments. “ # # #”

Photos from Pagadian Solar's post 31/03/2026

At 1610H (4:10pm), 31 Mar 2026.
Grid: Electric Utility {ZAMSURECO I)
Production: Solar Power Energy
Load: Appliances (Induction heater, Aircon 1.5hp)
Battery: (No batt) (on grid setting)

It's FREE Energy from the SUN 🌞☀️.




Pagadian Solar

11/03/2026

Good news to our Government Personnel 🎺 📣📣📣

CTTO
MANILA BULLETIN Business

03/03/2026

Attention 📣📣📣
Power interruption from Zamboanga del Sur I Electric Cooperative, Inc.

CTTO

Pagadian Solar

20/02/2026

Attention consumers !!! 📢📢📢

Nindot kung naay back up power source sama sa solar power.
Inquire at Pagadian Solar

NGCP SCHEDULED POWER INTERRUPTION!!!

Date: February 22, 2026 (Sunday)
Time: 6:00am - 6:00pm
Duration: 12 Hours

Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• SAN MIGUEL Substation
Municipalities affected:
•ENTIRE PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan

Reason/s of Interruption:
*NGCP will conduct Annual Preventive Maintenance of the 100MVA Power Transformer No.02 at Aurora Substation and Ride on Transmission line maintenance along the Aurora San Miguel 69kv line.

As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.

14/02/2026

Welcome! Excited to have you onboard! Jessie James Josh, Marife Tano Araula, Rallos John Ramdeer, Genevieve Luspo Dela Cruz - Guiñea, Sanny Mar Lansana Cansancio, Julious Abayon, Jeva Nera Gepanaga, Alvin MG, Johayra Betyo Malalis Cauntongan, Onifesoj Nalutupac, Ēïñgêner Franz Rainier, Ma Zie, Tutor Faith

Pagadian Solar

28/01/2026

We also have a CST 12v-100ah battery at Pagadian Solar .
For small solar power energy set-up.
German Technology.

26/01/2026

From Zamsureco II, their Power Rate is as follows:

For Residential = Php 12.8434 per kW hour
For Low Voltage = Php 11.8330 per kW hour
For High Voltage = Php 10.1381 per kW hour

It was increased from the previous month. 😢 😢 😢

CTTO

Pagadian Solar

Photos from Pagadian Solar's post 25/01/2026

Announcement 📢 📢📢
Pagadian Solar



CTTO

Want your business to be the top-listed Beauty Salon in Quezon City?
Click here to claim your Sponsored Listing.

Website

Address


Alta Tierra Tiguma Zone 11
Quezon City
7016