C. Fanucchi Salon

C. Fanucchi Salon

Share

Styling since 2009 and absolutely love what I do. Come relax and get beautiful by Christina.

05/04/2026

Beau Riley Dymczenski
Born May 3rd
7lbs 6oz 19in

Mama and baby are doing well. Mama’s body decided it was time for baby to come so Beau is needing a bit of help in the NICU just like big brother.

04/16/2026

Hello All,
We are counting down the last few weeks before I leave for Maternity leave. Here is a friendly reminder that I do require 48hr notice for any cancellations and at this time it is not possible to reschedule before I leave May 5th. If you cancel after the 48 hr notice you will be charged 50% of what you were scheduled for. I will be returning June 23rd and I do recommend trying to get on the schedule as I am already filling up for my return. Thank you for your understanding and continued business

03/03/2026

Please plan accordingly and consider scheduling in advance due to limited hours. Visit C.Fanucchi Salon at vagaro.com to schedule.

12/25/2025

Thank you all so much for supporting my business and me. I am so thankful for every single one of you! Cheers to a new year of even more wonderful memories, great hair, and laughs!💋

11/27/2025

Hope you all have a wonderful Thanksgiving 💋

11/18/2025

My family and I are happy to announce we have a little boy on the way!!! Coming May 2026💙

09/04/2025

Clients be advised of the closures coming this September! I will accommodate delays to the best of my ability.

https://www.facebook.com/share/p/19gwovrGQR/?mibextid=wwXIfr

Traffic Alert: Temporary Full Route 14 Closure Starting Monday, Sept. 15 ⚠️

Please be advised that Route 14 will be fully closed from north of Valencia Road to Hough Street beginning Monday, Sept. 15. The work is part of the Route 14 underpass project. The temporary closure, expected to last approximately four weeks, will allow Canadian National Railway to complete the temporary railroad tracks and shift train traffic. Once the railroad work is completed and the gap in the temporary roadway is constructed, Route 14 will reopen to full four-lane traffic.

During this time, a signed detour will be in place via Lake Cook Road and Hough Street. Please allow for extra travel time and plan accordingly.

Note that all local businesses, including the Barrington Area Library, will remain open and accessible during the closure. Shorely Drive local access will also be maintained for residents. See the traffic map below for more details.

Please help spread the word by sharing this post. Thank you for your patience and continued support of our local businesses during the closure!

Stay updated by visiting the dedicated project website at us14underpass.com and subscribing to receive email alerts.

07/23/2025

Here is the most recent update regarding the construction. Please plan accordingly

https://www.facebook.com/share/p/1FnhrqxCbm/?mibextid=wwXIfr

Route 14 Underpass Update 🚧

This past month, significant progress was made in preparing the temporary Route 14 roadway and railroad tracks. Canadian National (CN) is working to install signal equipment at the temporary railroad crossing, while AT&T and ComEd continue relocating utilities.

What’s Coming Next:

• One-Lane Closures (Scheduled to start Aug. 4) ⚠️
Route 14 will be reduced to one lane in each direction between Valencia Avenue and Hough Street to connect the temporary roadway. Access to adjacent roads and driveways will remain open. See the traffic map below for more details.

• Temporary Full Route 14 Closure (Anticipated as early as Sept. 15) 🚫
A temporary full closure of Route 14 is required for approximately four weeks so CN can complete the temporary railroad tracks and shift train traffic. A detour will be signed along Lake Cook Road and Hough Street.

Once the rail line is raised and the gap in the temporary roadway is constructed, Route 14 will reopen with full four-lane traffic.

06/15/2025

Wishing my Dad Clients a Happy Father’s Day! Hope you have a great day celebrating with those who love you the most💙

05/15/2025

I will be out of the Salon May 22nd-May 27th. I will be unplugged during this time so please schedule online at your convenience.
Www.vagaro.com/cfanucchisalon

03/13/2025

Just a heads up for my clients

🚧 Traffic Alert 🚧

The Canadian National Railway will be completing emergency repairs to the U.S. Route 14 rail grade crossing to address the track structure. These repairs are unrelated to the U.S. Route 14 Grade Separation (underpass) project.

This work will require temporary lane closures tomorrow, Friday, March 14, from approximately 9 a.m. to 1 p.m. Flaggers will be on-site to assist with traffic control. Please use caution and consider alternate routes during this time.

Want your business to be the top-listed Beauty Salon in Barrington?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


515 W Old Northwest Highway Suite 200
Barrington, IL
60010

Opening Hours

Tuesday 10am - 8pm
Wednesday 10am - 8pm
Friday 9am - 5pm
Saturday 8am - 4pm